Booking free consultations
CSLB #1137291 · Bonded · InsuredHours Mon–Fri & Sun 9am–5pmCall or text 424‑424‑3301
Call TextFree quote
Home / Cost guideCost guide

ADU cost in Los Angeles (2026).

Real price ranges from Pacific ProWorks for new detached ADUs and garage conversions, with add-ons like HVAC, solar and plans.

Pricing notice

Estimates only — your price is set in writing.

Figures on this page are typical ranges from recent Los Angeles projects, shown to help you plan. They are not a quote or an offer. Your price is fixed only in a signed contract after a site visit, and it depends on scope, site conditions, finish level and current material costs. City permit and inspection fees are paid by the homeowner. Offers have terms and some cannot be combined.

2026 prices

What a new ADU costs.

OptionTypical price*Details
400 sq ft$140,000–$180,000Base build at $350–$450 per sq ft
600 sq ft$210,000–$270,000Base build at $350–$450 per sq ft
800 sq ft$280,000–$360,000Base build at $350–$450 per sq ft
1,000 sq ft$350,000–$450,000Base build at $350–$450 per sq ft
200 sq ft garage conversion (1-car garage)$40,000–$50,000Conversion at $200–$250 per sq ft
400 sq ft garage conversion (2-car garage)$80,000–$100,000Conversion at $200–$250 per sq ft
600 sq ft garage conversion (3-car garage)$120,000–$150,000Conversion at $200–$250 per sq ft

*Rough ranges from recent Los Angeles projects, price list as of October 2026. Not a quote.

Free online tool

Build your own ADU estimate.

Pick the size and extras you want, see a rough price range right away, then send your picks for a free site visit.

Open the price estimator
What you get

What is included and what you supply.

Included in the base price

  • Foundation (slab)
  • Framing
  • Electrical
  • Plumbing
  • Gas
  • Sewer connection
  • Insulation
  • Drywall
  • Closet
  • Mechanicals (rough-in)
  • Exterior siding or stucco
  • Interior and exterior paint
  • Roofing
  • 1 kitchen and 1 bathroom (labor and building materials)
  • Flooring installation
  • Appliance and fixture installation

Supplied by the homeowner

Installation is included.

  • Countertops
  • Backsplash
  • Tile
  • Cabinets
  • Faucets and plumbing fixtures
  • Light fixtures
  • Appliances
  • Flooring material
  • Windows and doors
  • Bathroom fan
Add-ons

ADU upgrades and systems.

ItemTypical price*Details
Raised foundation$5,000–$10,000Raised floor on a perimeter foundation with crawl space, often used on sloped lots or to match the main house.
Mini-split$4,000–$6,000Ductless heat pump with a wall unit and outdoor condenser, for heating and cooling.
HVAC with ducts$15,000–$20,000Central heating and air with ductwork and vents to each room.
Tank water heater$4,000–$8,000Standard storage-tank water heater installed with required venting, seismic straps and connections.
Tankless water heater$6,000–$10,000On-demand tankless water heater with venting and gas or electric connection. Saves space and heats water as needed.
Electrical subpanel$4,000–$8,000A separate electrical subpanel to power the ADU from the main panel. A main panel or utility service upgrade, if needed, is extra.
Solar$10,000–$16,000Solar panel system for the ADU. California’s energy code (Title 24) requires solar on most new detached ADUs.
Plans, engineering & Title 24$6,500–$10,000Architectural plans, structural engineering and Title 24 energy report for the permit application. City plan-check and permit fees are paid by the homeowner.
Timeline

How long an ADU takes.

A new ADU usually takes 6–10 months of construction and a garage conversion 6–8 months, after plans and city permits. Plan check can add weeks to months.

Questions

Adu cost FAQ.

Step 1 — pick a topic. Step 2 — click a question.

Cost questions01 / 05

How much does an ADU cost in Los Angeles?

A new ADU base build runs about $350–$450 per square foot, for example $140,000–$180,000 for 400 sq ft and $280,000–$360,000 for 800 sq ft, with the homeowner supplying finishes.

Still unsure? Ask the owner.
Cost questions02 / 05

How much is a garage conversion?

About $200–$250 per square foot, for example $80,000–$100,000 for a 400 sq ft two-car garage.

Still unsure? Ask the owner.
Cost questions03 / 05

Are plans included?

No. Plans, structural engineering and Title 24 energy calculations for an ADU run about $7,000–$10,000.

Still unsure? Ask the owner.
Cost questions04 / 05

Is this a quote?

No. These are rough ranges for planning only. Your price is set in a written contract signed by you and Pacific ProWorks Inc. after a free site visit.

Still unsure? Ask the owner.
Cost questions05 / 05

Are city permit fees included?

No. City permit, plan-check and inspection fees are paid by the homeowner and are not included in these ranges.

Still unsure? Ask the owner.
Denette Rael
Still have a question? Ask Denette.Owner · Licensed GC
Next step

Ready for a real number?

Free on-site visit with the owner. Licensed, bonded and insured, CSLB #1137291.

Let’s build

Ready to start
your project?

Free on‑site consultation with the owner. We get back to you fast — call, text or send the form.